Bionics Enviro Tech

Commissioning & Revamping Bioculture for Wastewater Treatment Plant
Start-Up & Ageing Wastewater Plants Commissioning & Revamping Solutions Expert in India

Book a Free Expert Consultation & Quote—to meet PCB Norms.

Ready to Optimise Your New or Existing Underperforming Wastewater Plant?

Reduce operational costs, ensure compliance, and treat effluent effectively—with minimal sludge, COD, BOD and zero odour and colour.

Solutions

Commissioning & Revamping for ETP/STP, CETP & CSTP Wastewater Treatment Plants

At Bionics Enviro Tech, we offer expert-driven, result-oriented bioculture solutions for commissioning and revamping of wastewater treatment systems. Whether you’re starting a new plant or optimizing an underperforming one, our solutions are designed to help you reduce operational costs, ensure compliance, and treat effluent effectively—with minimal sludge and zero odor.

Wastewater Treatment Nanozyme Bioculture Solutions Built for Performance & Compliance

Whether you’re commissioning a new plant or revamping an existing one, Bionics Enviro Tech offers expert-led, biologically advanced Nanozyme microbial bioculture solutions to help you meet discharge norms, reduce sludge, eliminate odor, and improve plant efficiency with Nanozyme Bioculture. Our approach is backed by 500+ installations across India in textile, pharma, food processing, dairy, distillery, and public utilities.

 

Commissioning

Revamping

Primary ObjectiveAccelerate biological stabilization and ensure seamless start-up of new or expanded treatment facilitiesRestore performance in ageing or failing systems without extensive civil or mechanical modifications
Common Operational Challenges❌ Delayed COD/BOD reduction
❌ Unstable biomass
❌ Odor and color at discharge
❌ High initial sludge generation
❌ Rising operational costs
❌ Frequent sludge handling/removal
❌ Regulatory non-compliance (PCB)
❌ High COD / BOD
❌ Odor, foaming, and color issues
❌ Over-dependence on chemicals
Nanozyme Advantage✅ Rapid microbial colonization using high-activity strains
✅ Achieves COD/BOD reduction in 5–7 days
✅ Enables faster handover & early PCB compliance
✅ Re-establishes biological balance
✅ Reduces sludge volume by up to 80%
✅ Cuts down polymer and chemical usage
✅ Stabilizes processes under variable loads
Best Fit For✔️ Newly commissioned STP/ETP/CETP/CSTP units
✔️ Greenfield ZLD projects
✔️ Capacity expansions and trial-based pilots
✔️ Plants ≥ 3 years old
✔️ Overloaded or non-compliant facilities
✔️ Units receiving PCB notices or public complaints
✔️ High OPEX, high sludge-producing systems

What We Do – Our Approach:

  • Pre-Audit
  • Minimize operational cost without structural changes
  • Customized Nanozyme Seeding & Dosing Plan
  • COD/BOD Stabilization Protocol
  • Gradual reduction of chemical dependency
  • Stabilize your plant process

Why Choose Nanozyme Bioculture from Bionics Enviro Tech?

End‑to‑end support

  • ✔️ 15+ Years in Wastewater Treatment
  • ✔️ Serving 500+ clients nationwide
  • ✔️ Backed by Award-Winning R&D
  • ✔️ Expert team for Bioculture Solution
  • ✔️ Proven Results Across All Sectors
  • ✔️ Free Technical Consultation
  • ✔️ Easy to use– No Equipment Change Needed
  • ✔️ Rapid BOD/COD drop
  • ✔️ Zero sludge operation
  • ✔️ Odor & color elimination with our High-performance Nanozyme Bioculture
  • ✔️ Get Commissioning with PCB discharge norms

 

Frequently Asked Questions

Before aftter
Will this work with our existing aeration setup?

Yes, Nanozyme works with most STP/ETP setups. No equipment change required.

How soon can we expect results?

Visible results typically begin within 3–5 days, with full stabilization in 7–10 days.

Do we need to stop the plant during application?

No, your plant can run normally during microbial application.

bioculture
Patents
0 +
Installations
0 +
Trained Service Engineers
0 +
Manufacturing Units
0

Our Testimonials